ALGERIA: MOSTAGANEM TRAMWAY

Customer

Entreprise Metro d'Alger

Subsystem

Duration of the project

2013 - ongoing

Project's description

The first tramway line of Mostaganem, 14.2 km long, is composed of 2 sections:

  • The first section connects the “Salamandre” sector to the “Kharouba” sector, 12.2 km long and with 20 stations.
  • The second section connects the SNTF station to the new bus station, 2 km long and with 4 stations.

Scope of work

The evaluation covers the following phases:

  • Phase 1: Design of the installations and manufacturing of the equipment
  • Phase 2: Manufacturing – Installation
  • Phase 3: Tests and trials
  • Phase 4: Preparation for operation
  • Phase 5: Commissioning (Safety file)
  • Phase 5.1 Partial safety file
  • Phase 5.2: Completion of the safety file
Achievements
See all
France: haut-bugey conventional line
France: Eole project
NoBo/DeBo FR/AsBo Services
France: CDG express line assessment
DeBo/NoBo/AsBo Services
France: bypass of Donges industrial sites
NoBo, DeBo and AsBo service
France : Bretagne Pays-De-La-Loire (BPL) HSL
Evaluation of the TGV POS subsystem in relation to TSI
Baltic Countries: Rail Baltica Project
NoBo/AsBo service
Denmark: Ringsted – Fehmarn
NoBo / ISA Services

Do you have a project?

Do you need an expert support for your railway project?

Are you a mobilty expert?

Join our team to work on innovative projects and advance the future of mobility together.